Improvements to Jamaica Pond Pathways and Perimeter

Repaving the pathways around Jamaica Pond

Develop a comprehensive plan of Jamaica Pond Park to rehab pathways and entrances at Jamaica Pond. The goal was to improve:

  • accessibility
  • site conditions, and
  • drainage to protect water quality.

Pathway improvements include analysis of the existing pavement, entrance, and drainage. We also reviewed paving connections to the building, dock, and staircases.

 
Project location:
Jamaica Pond Park
507 Jamaicaway
Jamaica Plain
Project contact:
Project information:
  • Project status: Construction/ Punch list
  • Project features: Passive use, natural area
  • Consultant: Kyle Zick Landscape Architecture, Inc.
  • Contractors: Tasco and Lorusso
  • Construction budget: $4,000,000