city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Trash and Recycling Update
/
There will be no trash collection in any neighborhood on Christmas Day (Thursday, December 25). Visit the Trash Day app to see how your pickup schedule will be impacted.
Check your schedule

South End Landmark District Commission

The South End Landmark District Commission will hold a public meeting on Tuesday, January 4, at 5:30 p.m.

To participate, please go to our Zoom meeting link or call 929-205-6099 and enter meeting id 884 8409 6222#. You can also submit written comments to staff via email at SouthEndLDC@boston.gov.

The public can offer testimony.

Discussion Topics

  1. Violations

    APP # VIO.22.0543   665 TREMONT STREET

    Proposed work: Repair existing rotted wood frame of storefront, install teakwood panels at storefront, replace awning fabric with black, replace front door.

  2. Design Review Hearing

    APP # 22.0631 SE      89 WALTHAM STREET #5

    Proposed work: Replace window that was replaced without approval with a one-over-one double hung wood window.

    APP # 22.0498 SE          613 MASSACHUSETTS AVENUE

    Proposed work: Replace wood decking with composite material. Install poles and catenary lights at roof deck.

    APP # 22.0617 SE     71 RUTLAND STREET

    Proposed work: Replace non-historic front door with new double door.

    APP # 22.0601 SE           76 CHANDLER STREET

    Proposed Work: Remove non-historic wood and vinyl windows, and storm windows, at the garden, 1st, 2nd, 3rd levels.  Install two-over-two, double-hung aluminum-clad over wood windows painted black to match. Remove the white rear patio door and storm door, and install aluminum-clad over wood door and hinged screen painted black to match.

    APP # 22.0675 SE          553 SHAWMUT AVENUE

    Proposed work: Remove existing door, and door surround including transom and sidelights, and install new mahogany door.

    APP # 22.0678 SE          551 TREMONT STREET

    Proposed work: Swap (2) BTS equipment cabinets, remove (12) coax cables, Add (9) Remote radio units, Add (3) panel Antennas, Swap (3) panel Antennas, swap (3) Hybrid cables.

    APP # 22.0706 SE          1525 WASHINGTON STREET

    Proposed work: Remove and replace non-historic door, shift location of existing pilaster, and match paneling in center bay to entire ground level façade.

    APP # 22.0665 SE          CLARENDON STREET AT COLUMBUS AVENUE

    Proposed work: Construct a curb extension at the northeast corner of the Clarendon Street and Columbus Avenue intersection.

    APP # 22.0657 SE          1200 WASHINGTON STREET

    Proposed work: Install privacy screen and shade pavilion at roof.

  3. Administrative Review/Approval

    APP # 20.0641 SE          35 Bradford Street: Replace flat roof, re-flash skylight, and install copper gutters.

    APP # 20.0672 SE          4 Concord Square: Replace flat roof, re-flash skylight, and install copper gutters.

    APP # 22.0705 SE          131 Dartmouth Street: Replace existing awnings in in kind for new vendor.

    APP # 21.0992 SE           30 Dwight Street: Replace six existing windows in-kind.

    APP # 22.0664 SE          23 Gray Street: Replace non-historic windows with aluminum clad two-over-two windows; remove metal grates on basement level windows.

    APP # 22.0681 SE           7 Ringgold Street: Remove roof and replace rotten boards, replace rubber membrane, gutters, and window casements. Re-shingle roof with existing slate , add flashing between brick and mansard.

    APP # 22.0666 SE          29 Rutland Street: Remove existing asphalt shingles and replace in-kind.

    APP # 22.0500 SE    209 West Newton Street: Emergency repair of flat roof and copper gutters.

  4. Advisory Review

    1395 Washington Street

    Proposed Work: Demolish existing 1-story commercial structure and construct a 7-story multi-family building above ground floor retail.

  5. Ratification of 12/7/2021 Hearing Minutes
  6. Staff Updates
  7. Projected Adjournment: 9:30PM
Back to top