East Boston: 11 Cheever Court Abutters Meeting
Proposing to build a new three-family home on the same foundation footprint as the previous building, which collapsed during earlier construction work (under ALT1568087). A new permit was required because the foundation was poured. The project will include a 13R sprinkler system and 24V fire alarm system for safety.
The purpose of this meeting is to get community input and listen to the resident's positions on this proposal. This is a virtual meeting via Zoom.
Meeting ID: 160 358 3882
Please note, the City does not represent the occupant(s)/developer(s)/attorney(s)/applicant(s).