Boston Landmarks Commission
The Boston Landmarks Commission will hold a public hearing on Tuesday, March 24, 2026, at 6 p.m.
This meeting will only be held virtually and NOT in person. You can participate in this hearing by going to the online meeting or calling 646-828-7666 and entering meeting id #160 364 4859. You can also submit written comments or questions to blc@boston.gov.
Discussion Topics
- Business Hearing - 6:00pm
- Ratification of 3-10-2026 Hearing Minutes
-
Design Review Vote - Administrative Approval Items
APP #23.0855 BLC BOSTON PUBLIC GARDEN
Extend 2024 approval for the renovation of existing Tool Shed and construction of a new Parks Facilities building with minor landscape changes to accommodate new programming to 3-6-2027.
APP #26.0708 FPC 15 CHANNEL CENTER ST.
Repair existing entrance canopy and repaint steel support beams.
APP #26.0703 BLC CHRISTIAN SCIENCE CHURCH COMPLEX PLAZA
Remove and replace brick pavers at plaza as part of an ongoing waterproofing project.
APP #26.0724 BLC CITY SQUARE PARK, CHARLESTOWN
Improvements to City Square Park, including restoration of WWII Memorial, restoration of bronze plaques, re-setting of brick pathways, and installation of root barriers.
APP #26.0700 BLC OLD CORNER BOOKSTORE, 277 WASHINGTON ST.
Rebuild non-historic infill masonry wall between 277 Washington Street (Cunningham House) and Pi Alley Garage.
APP #26.0711 BLC OLD NORTH CHURCH, 193 SALEM ST.
Rebuild steps at Lantern Garden
APP #26.0696 SB 142 ST. BOTOLPH ST.
Remove and replace 13 windows with dark bronze fibrex windows.
APP #26.0713 BLC QUINCY MARKET, 206 SOUTH MARKET ST.
Exterior maintenance of existing windows and glass sheds in the North, South, and Quincy Market buildings. Existing windows will be repaired and painted along with the glass shed structure, mullions, garage doors, and entry doors.
-
Study Reports and Designations
147.89 - COPLEY PLAZA, BACK BAY
- Presentation of Study Report
- Public feedback on Study Report
- Discussion of Study Report
- Vote to accept Study Report
- Vote on Designation
-
Demolition Delay (Article 85)
D.25.0310 - 40R-42 TEMPLE STREET, MATTAPAN
- Proposed demolition of 40R-42 Temple Street
- Discussion and Vote
-
Staff Updates
The next BLC Hearing will be Tuesday, April 14, 2026.